Development on version 1.x (Current Map Improvements)
-
- Posts: 23
- Joined: 27 Aug 2013 13:07
I would prefer too see a full tollgate on the m4 severn bridge, than no toll gate, even if it should be westbound only.
Even that can't happen as the traffic will be driving the wrong way (continental style)onionbarje wrote:I would prefer too see a full tollgate on the m4 severn bridge, than no toll gate, even if it should be westbound only.
I am Dutch living in New Zealand and I speak EN DE SE FR
- Jan Verschueren
- Posts: 1860
- Joined: 17 Aug 2013 21:11
- Donation rank:
- Location: Linkeroever, Antwerpen
Aha! -I was just wondering why some toll bridges in the UK aren't toll bridges in the game.
"You know you've played too much ETS2 when..."
"Bad cop" forum moderator, if required.
"Bad cop" forum moderator, if required.
-
- Posts: 182
- Joined: 24 Jul 2014 17:12
- Location: Edinburgh, UK
It sounds like we could use a new single-booth toll object for mappers to use.
EK Water-cooled : Intel 4770K 4.5GHz 1.275V / 16Gb 1600 / ASUS 780 Ti 3Gb 1274 boost, 7800 mem / Samsung 840 Pro 256Gb, Samsung 840 Pro 256Gb / Apple Cinema Display 27" 2560x1440 / Corsair AX860I / APC SMT1000I / Windows 8.1 64-bit
Wouldn't a one-way toll gate prefab solve our problems? Just brainstorming here...
- MandelSoft
- Lead Developer
- Posts: 3835
- Joined: 08 Aug 2013 10:48
- Location: Delft [NL]
Nope. You still would have to reverse the paths.
Your daily dose of wisdom!
╔═══╗────╔═╗╔═╗────╔╗
║╔═╗║────║║╚╝║║────║║
║╚═╝╠═╦══╣╔╗╔╗╠══╦═╝╠══╗
║╔══╣╔╣╔╗║║║║║║╔╗║╔╗║══╣
║║──║║║╚╝║║║║║║╚╝║╚╝╠══║
╚╝──╚╝╚══╩╝╚╝╚╩══╩══╩══╝
Don't ask us for a release date; we don't know either.
╔═══╗────╔═╗╔═╗────╔╗
║╔═╗║────║║╚╝║║────║║
║╚═╝╠═╦══╣╔╗╔╗╠══╦═╝╠══╗
║╔══╣╔╣╔╗║║║║║║╔╗║╔╗║══╣
║║──║║║╚╝║║║║║║╚╝║╚╝╠══║
╚╝──╚╝╚══╩╝╚╝╚╩══╩══╩══╝
Don't ask us for a release date; we don't know either.
Reverse which paths?MandelSoft wrote:Nope. You still would have to reverse the paths.
I'm probably overlooking something, because as far as I can tell, it's as simple as this;
- MandelSoft
- Lead Developer
- Posts: 3835
- Joined: 08 Aug 2013 10:48
- Location: Delft [NL]
That is if the geometry of the approaches where symmetrical. But that is not the case. The approaches are highly assymetrical, causing this to be a problem.
Your daily dose of wisdom!
╔═══╗────╔═╗╔═╗────╔╗
║╔═╗║────║║╚╝║║────║║
║╚═╝╠═╦══╣╔╗╔╗╠══╦═╝╠══╗
║╔══╣╔╣╔╗║║║║║║╔╗║╔╗║══╣
║║──║║║╚╝║║║║║║╚╝║╚╝╠══║
╚╝──╚╝╚══╩╝╚╝╚╩══╩══╩══╝
Don't ask us for a release date; we don't know either.
╔═══╗────╔═╗╔═╗────╔╗
║╔═╗║────║║╚╝║║────║║
║╚═╝╠═╦══╣╔╗╔╗╠══╦═╝╠══╗
║╔══╣╔╣╔╗║║║║║║╔╗║╔╗║══╣
║║──║║║╚╝║║║║║║╚╝║╚╝╠══║
╚╝──╚╝╚══╩╝╚╝╚╩══╩══╩══╝
Don't ask us for a release date; we don't know either.