Page 46 of 49

Re: Development on version 2.x (Black Sea Merge)

Posted: 27 Aug 2020 07:10
by DubLuV
Taking in consideration that Romanian map is pretty new, they maybe thought about continuint the started work for old cities and roads nad for sure we will see further updates for Black Sea region.

Re: Development on version 2.x (Black Sea Merge)

Posted: 28 Aug 2020 18:11
by krong2013
how can correct the bulgarian sign at the entrance? should be БЪЛГАРИЯ, but not БЪЛЛГАРИЯ
https://ibb.co/3sY13py

Re: Development on version 2.x (Black Sea Merge)

Posted: 28 Aug 2020 18:32
by Frate
Thats a DLC-region right?
I´d report that too SCS to let them fix it.

Re: Development on version 2.x (Black Sea Merge)

Posted: 05 Sep 2020 18:22
by ro.gaming26
Yesterday Romania and Hungary opened A3-Bors Border M4 motoway in total is 30km 5km in Romania and 25 km in Hungary this is a very important news for all truckers did promods replace old border by this new highway border?

Re: Development on version 2.x (Black Sea Merge)

Posted: 06 Sep 2020 04:43
by Shiva
Does it go all the way to DN19E or to DN19?

Re: Development on version 2.x (Black Sea Merge)

Posted: 06 Sep 2020 14:43
by ro.gaming26

Re: Development on version 2.x (Black Sea Merge)

Posted: 06 Sep 2020 16:51
by arrahik
Oh man the road from Varna down to Burgas is so innaccurate imo. Where's the winding road down from Varna to Burgas? It would've been a cool challenge to drive there. Where are the small touristy villlages like Sl. Bryag, Sozopol, Nesebar etc. etc. Where's the sea along the road? The views would've been magnificent. I realise that too much detail can't be added, but SCS could've done a far better job imo. It's starting to feel like they spend more time detailing the expansions in ATS than in ETS2.

Also Dobrich, a big-ish town 50 km northwest from Varna, is missing, but Mangalia which is far smaller than Dobrich is in the game? 82k population vs 40k population.

Re: Development on version 2.x (Black Sea Merge)

Posted: 06 Sep 2020 19:36
by JohnBart
ro.gaming26 wrote:
05 Sep 2020 18:22
Yesterday Romania and Hungary opened A3-Bors Border M4 motoway in total is 30km 5km in Romania and 25 km in Hungary this is a very important news for all truckers did promods replace old border by this new highway border?
No, and I doubt we would do it anytime soon. With the current scale, I'm pretty sure we won't be able to fit M4 and M35 besides the current roads (4, 42, 47).

Re: Development on version 2.x (Black Sea Merge)

Posted: 06 Sep 2020 22:32
by Shiva
arrahik, blame the scale.

JohnBart and ro.gaming26, only way to fit A3-Bors Border M4 motorway, would be to rebuild the area. And that means deleting the current E79 at the border.
For that, I see no reason, for atleast a few + years.
I would not call it viable, not until more of A3 is built.
When border to Cluj-Napoca of A3 is complete. Then I would call it viable.
But that might very well mean that the DN1 between Borș and Gilău would be deleted.
Only possible good side of it, as I see, could be that, there might be space for Oradea?
As I see it, the current Borș border crossing and the border crossing of the M35/A3 would be very close or even at the same place/space.


Hungarian roads (4, 42, 47)?
M35 and 4 = Ok
42 between 4 and 47? = Deleted.
M35, would have the interchange to 47 south, just before the border crossing.

How A3 between the border area and DN19 looked mid july 2020?

Re: Development on version 2.x (Black Sea Merge)

Posted: 07 Sep 2020 02:25
by Frate
Even if it is a shame to delete some roads, I´d still prefer to have the Motorway, as the motorway is probably the road a trucker in that area uses.
Why should someone take the 4, 42 or 47 if there is a Motorway?
On top of that it is sooner or later unavoidable to build that Motorway, when it will be connected to the A3 to Cluj-Napoca irl.
Even if it takes time, consider building the Motorway.
It would be an investment for the future.